From motor-control concept to production-ready electronics.
Evaluate Sankey as a BLDC motor controller manufacturer by reviewing R&D, SMT production, inspection, testing, engineering support, and OEM project delivery.
PCBA production
Project validation
Registration document below
Supplier records for your project review
ISO 9001 registration document
- Certificate holder
- Guangdong Shunde Sankey Electronic Technology Co., Ltd.
- Document number
- 18ACM6096Q
- Standard shown
- ISO 9001:2015
- Scope shown
- R&D and production of control boards for electronic products
- Document dates
- Issued September 20, 2025; stated expiry September 19, 2028, subject to maintaining the system and surveillance requirements.
This is the registration document held in our website records. Confirm current registration status and the relevant production site during supplier approval. A quality-system registration does not establish certification of every finished product.
View the registration documentEvidence to request before release
Ask for the project drawing and revision, motor or load configuration, agreed test conditions, acceptance criteria, inspection scope and any product-specific compliance documents.
Confirm the production site
The registration document identifies the office and production address as 3F, Building 6, Keneng Industrial Park, Zhenghe Road (S), Leliu Town, Shunde District, Foshan, Guangdong, China. Please confirm the site and visit or shipping instructions with our team before arranging a delivery or visit.
Request supplier or project records
Hardware and software expertise, under one roof.
Our independent R&D capabilities span motor-drive algorithms, embedded hardware and software, operating control, complete-system solutions, and smart IoT integration. We support app connectivity, Tmall Genie integration, and Tuya-enabled solutions.
Sankey has built complete solution platforms for AC motor controllers and DC variable-frequency drive controllers, serving motor drives, decorative fans, industrial fans, water pumps, and related applications.

Independent engineering
Control-system design and application development tailored to product needs.

Automated SMT production
Advanced automated SMT lines support consistent, scalable manufacturing.

In-line inspection
AOI, AI insertion, wave soldering, and process-level quality control.

Reliable by design
ICT, FCT, and aging tests validate product performance before delivery.
Manufacturing, engineering, and certification evidence.
These images document Sankey production and engineering workspaces. Certification documents are presented with their stated scope and date so project teams can review the relevant evidence during qualification.



Global-Mark Certificate of Suitability
Document issued to Guangdong Shunde Sankey Electronic Technology Co., Ltd. for the stated electrical-safety product scope. The supplied document states an expiry date of 25 November 2028. Confirm applicability to a specific product before relying on it for market access.

ISO 9001:2015 registration
The supplied registration certificate covers R&D and production of control boards for electronic products. It states a certificate date of 20 September 2025 and an expiry date of 19 September 2028.
Give OEM teams the evidence needed to evaluate a motor-control supplier.
For a controller program, the supplier evaluation should connect development, manufacturing, and verification. Sankey works from application requirements through prototype review, production test planning, and change control so the same agreed specification can be used through sampling and volume delivery.
Project definition
Review motor characteristics, functions, interfaces, target market, and the technical evidence needed for a workable controller specification.
Production preparation
Align drawings, approved components, test fixtures, inspection checkpoints, and traceable revisions before volume release.
Quality communication
Set measurable acceptance conditions for electrical behavior, functional testing, aging, and changes so that project decisions can be reviewed against documented requirements.